230613340 SURVEYING FOR ARCHITECTURE ( 3 Crd.Hrs )

Pre-Requisites : 100411010

Basic definitions in surveying, Recording field data and notes, Error types and Sources. Units, Metric and English system. Plotting and Map Scale and types. Linear Measurements, Electronic Distance Measuring Instruments. Leveling, Datum, Bench Marks. Directions, Reduced Bearing, Geographic or True North, Azimuth. Theodolite, Measuring Horizontal and Vertical Angles. Contour Lines. Coordinates calculations and Traverses. Area and Volumes and earth work calculations.